Case Studies — Chapter 006

The work, described without naming the customer.

Material, process, equipment, inspection method and the problem that made the part difficult. No customer names, no part numbers, no proprietary geometry.

01 · Aerospace structure

Contoured titanium bracket, four setups reduced to one

A thin-walled structural bracket with compound angles and true-position callouts on both faces. The incumbent process required four setups, and stack-up from re-clamping was consuming the position tolerance.

Material
Ti-6Al-4V
Process
5-axis milling, single setup, in-process probing
Equipment
Okuma Genos M560V-5AX · Okuma MU-5000V
Inspection
First article on the ZEISS ACCURA with RDS head; in-process CMM sampling by lot
Outcome
One setup, position held to print with margin, and a repeatable process sheet that runs the same way on either machine.
02 · Medical device

Swiss-turned stainless shaft at production volume

A small-diameter shaft with a ground-quality finish requirement, a cross-drilled feature, and full lot traceability on every release.

Material
303 / 316 stainless
Process
Swiss-type turning with sub-spindle, live tooling, bar-fed lights-out
Equipment
Citizen L20 · Citizen L12
Inspection
Keyence IM image dimension system on first, middle and last of run; certified pin and bore gaging at the machine
Outcome
Finish achieved as-machined without a secondary grinding operation, with an automated inspection report attached to each lot.
03 · Defense subsystem

Turned-and-milled alloy housing with outside processing managed in-house

A housing requiring turning, Y-axis milling, tapped features, laser marking and a plated finish — previously split across three vendors, with schedule slipping at every handoff.

Material
Alloy steel
Process
CNC turning with Y-axis and sub-spindle, secondary milling, laser marking, managed outside finishing
Equipment
DMG MORI NLX 2500SY/700 · Brother Speedio R450 · OMTech Galvo laser marker
Inspection
CMM layout on first article, attribute gaging in process, certificate of conformance with each shipment
Outcome
One purchase order, one traveler, and one supplier accountable for the finished part at the dock.

Have a part with a similar problem?

Submit an RFQ →
Start a Conversation

Have a part in mind? Let's talk.

Tell us a little about your project and our team will follow up with a quote, lead time, and recommended process path.

310 · 327 · 8127
info@rjenterprise.net
Gardena, California · AS9100D
Message

Typical response: 1 business day